Capabilities

Machining, welding, galvanising, moulding and assembly under one group of factories — with the inspection paperwork to go with it.

3Factory bases
±0.02 mmMachining tolerance
15–25 daysTypical lead time

01Process

Five steps, no surprises.

Every custom order follows the same route. The times are the ones we plan against, not the best case.

01

Drawing review

Tolerance stack-up, material grade, lifting angle and coating are checked against the drawing. Open questions go back in writing.

24 hReview sheet
02

Process design

Machining route, tooling, fixtures and inspection plan. Quoted with a realistic lead time, not a hopeful one.

48 hQuote + route
03

First article

Sample with a dimensional report. Nothing runs in volume until you have signed it off.

7–10 dSample + report
04

Production

Batch cards travel with the parts. In-process checks every two hours, photos on request.

15–25 dBatch card
05

Inspection and packing

AQL 1.0 final inspection, then packing for sea freight with a packing list and loading photos.

3 dInspection report

02Shop floor

What the factories can do.

Three bases in Zhejiang, each with its own specialism, sharing one inspection standard.

01

CNC turning and milling

12 units · ±0.02 mm

02

Automatic welding

2 cells · MIG / TIG

03

Hot-dip galvanising

Line · 70 µm class

04

Punch presses

25–160 t

05

Injection moulding

80–400 t

06

Metrology and lab

CMM · salt spray · load rig

03Quality

Records, not promises.

Inspection is not a final gate. Each of these points has an owner, a record and a limit that cannot be waived by the sales team.

01

Batch records

Kept for five years, retrievable by order number.

02

Third-party testing

SGS / TÜV on request, at cost.

03

Written limits

If a batch does not pass, it does not ship — whatever the promised date.

04Inspection

Where we check, and what we keep.

01

Incoming steel

Mill certificate checked against the heat number, plus a spectro test on every coil.

02

In process

First article plus a patrol every two hours; dimensions logged on the batch card.

03

Coating

Thickness at five points, then 480 h neutral salt spray on a coupon per batch.

04

Load

Proof load at 3× working load on a sample from each lot, with the curve kept on file.

05

Final

AQL 1.0 visual and dimensional inspection before the carton is sealed.

05Documents

What travels with the container.

Material certificates, load-test reports, coating thickness records and the packing list are issued with the shipping documents. The quality management system is certified to ISO 9001:2015 — certificate 79426Q00151R0374, valid until 4 August 2029.

ISO 9001:2015GB/T 19001-2016CNAS C374-MMill certs & load tests

Click any document to read the full certificate.

Questions buyers ask us

The four questions that come up in every RFQ. Anything else — send a drawing.

Which certificates does LSW hold?

ISO 9001:2015 certificate 79426Q00151R0374 (valid to 2029-08-04) and four CNIPA utility model patents on the dry raised floor system.

Is there third-party test data?

Yes: SGS REACH SVHC screening (report NGBHL23004945901), GQT raised floor testing to GB/T 36340-2018, and Ningbo QTI adjusting screw testing to GB/T 7314-2017.

How are batches traced?

Every batch carries a record kept for five years, retrievable by order number.